Wood Harbinger provided the 2001 Electrical Infrastructure System Plan (EISP) for Sea-Tac International Airport.
The EISP for the primary electrical power systems, secondary power systems, and emergency power systems included:
-
Identifying systems, planning assumptions, and expansion needs;
-
Inventorying and assessing existing systems and conditions;
-
Defining existing systems' connected loads, capacity, and demand;
-
Updating models of existing systems;
-
Developing alternative system configurations;
-
Identifying pros and cons of various alternatives;
-
Recommending alternatives with rationale;
-
Updating systems load forecasts;
-
Defining future load growth;
-
Developing a yearly implementation plan for the selected development configuration; and
-
Updating the Infrastructure Master Systems Design Standards and Guide Specifications.
More Aviation Projects.
More Utility Systems Projects.