This project involved the construction of a cast in place wet well/dry well sewage lift station
in Kent, WA. The lift station was designed to handle peak flows of 10,000 gpm.
The facility consists of submerged wet and dry wells, a wet well and manhole odor
control system, and an above-grade control building housing electrical equipment, control rooms,
restroom, and office space.
Wood Harbinger provided:
-
Heating, ventilation, and cooling systems;
-
Odor control system;
-
Fire protection system;
-
Assistance with the evaluation of hazardous area classification;
-
Value Engineering concepts and ideas at the 50% design phase to reduce the overall construction cost; and
-
Quality assurance review of electrical subconsultant’s design.
More Industrial Projects.