Master Plan

Providence St. Peter Hospital - Olympia, WA

Wood Harbinger studied the existing mechanical infrastructure and developed recommendations in support of a multi-year, multi-phase Master Plan for major additions to the hospital and extensive remodeling of existing areas.

Mechanical aspects of the Master Plan include expansion of the existing central plant, selection of equipment that reduces total lifetime cost of operation, and new mechanical systems to serve the new construction. Areas addressed in the Master Plan include:
  • Chilled water
  • Steam distribution
  • Domestic hot water
  • Fuel oil storage
  • Medical compressed air
  • Medical vacuum
  • Oxygen
  • HVAC
  • Supplemental ventilation
  • Air filtration
  • Fire suppression
More Healthcare Projects.
      Printer Friendly PDF
WOOD HARBINGER, INC. | Mechanical / Electrical Engineers | 3009 112th Avenue NE, Suite 100 | Bellevue, WA  98004 | (425) 822-9499
Copyright 2007   Wood Harbinger, Inc.