Wood Harbinger provided the electrical design and construction administration for a 7,500 SF
theater renovation at Seattle Central Community College. This project lowered the stage 15 feet
to provide better site lines and more seating. The upstage wall was moved back
by 15 feet, and the Mezzanine Level was demolished.
We provided the design to demolish selective electrical distribution and branch circuits,
and to provide a modern lighting system with energy-efficient lighting controls and
a 100% increase in the capacity of the stage lighting system.
More Education Projects.