Fire Stations 1, 3, 5, 6, and 7 Fire Protection

City of Bellevue - Bellevue, WA

Wood Harbinger is providing fire protection design engineering and construction administration services for the City of Bellevue Fire Department to upgrade the fire protection systems at five fire stations. The stations remain occupied during construction 24 hours a day, seven days a week.

Work includes fire sprinkler design, in accordance NFPA 13 and the Bellevue Fire Department Development Standards for:
  • A complete dry pipe fire protection system in Fire Station 1;
  • Automatic wet pipe sprinkler systems at Fire Stations 5, 6, and 7; and
  • Modifying and updating the wet pipe system at Fire Station 3.
The new systems include fire sprinkler switches and fire alarm wiring for a future connection to fire alarm control panels. More Fire Protection Projects. More Government Projects.
      Printer Friendly PDF
WOOD HARBINGER, INC. | Mechanical / Electrical Engineers | 3009 112th Avenue NE, Suite 100 | Bellevue, WA  98004 | (425) 822-9499
Copyright 2007   Wood Harbinger, Inc.